RIS ID
39127
Abstract
This article presents two design configurations for the secondary chilled water system in a super high-rise building being constructed in Hong Kong. Both configurations are implemented in this building to test and evaluate their operational performance.
Publication Details
Ma, Z., Wang, S. & Pau, W. (2008). Secondary loop chilled water in super high-rise. ASHRAE Journal, 50 (5), 42-52.