University of Wollongong
Browse

Development of a graphical user interface for WBNM

Download (30.01 MB)
thesis
posted on 2024-11-11, 10:40 authored by Andrew Wiersma
The focus of this research project was the analysis of the process of designing a new Graphical User Interface (GUI) for a computer model, with specific application to the design of a new GUI for the rainfall-runoff model Watershed Bounded Network Model (WBNM). The primary outcome of the project was the development of iWBNM, an Excel-based spreadsheet interface to the WBNM hydrologie engine. The development process of iWBNM included the review of several similar computer models and the application of general engineering design guidelines to the specific task of designing a new user interface. In its completed form, iWBNM presents the hydrologie modeller with a user-friendly and efficient method of building a rainfall-runoff model. A secondary outcome of the project was the development of algorithms for sorting subcatchments and for quickly running a spectrum of storm Average Recurrence Intervals (ARIs) for a single storm duration. The sorting algorithm sorts a list of subcatchments based on simple stream connectivity and on the more complex connectivity arising from structures and diversions. The storm duration algorithm uses a bracketing approach to reduce the number of model runs needed to establish the critical storm duration for a whole range of ARI. A third outcome of the project was the analysis of the effect of the Embedded Design Storm procedure on the critical duration of a catchment. It was found that the critical embedded design burst was significantly lower than the critical duration generated by the standard design storm approach. This was primarily due to the lead-up rainfall in the embedded storm routine. design burst was significantly lower than the critical duration generated by the standard design storm approach. This was primarily due to the lead-up rainfall in the embedded storm routine.low in the airways, an analytical solution is able to be determined. However, to do so depends on the validity of a modified Dini expansion of a function. This is established so that the operational and analytical solutions can be compared.

History

Year

2008

Thesis type

  • Masters thesis

Faculty/School

School of Civil, Mining and Environmental Engineering

Language

English

Disclaimer

Unless otherwise indicated, the views expressed in this thesis are those of the author and do not necessarily represent the views of the University of Wollongong.

Usage metrics

    Categories

    Keywords

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC