University of Wollongong
Browse

Delay analysis of mechanised longwall faces

Download (17.24 MB)
thesis
posted on 2024-11-11, 10:43 authored by Xiaodong Zhang
Australia is the largest exporter of hard coal. With the large opportunity for economic, social and political benefits from coal as a natural resource, longwalls are widely adopted by the Australian Coal Industry. By the end of 1995, there were 28 longwall operations in Australia. The percentage of longwall productions covering total raw underground coal production has rapidly been increasing since the introduction of the first longwall mining to Australia. Meanwhile, significant attention has been paid towards increasing longwall productivity. Even though longwall systems are designed to cut and produce coal at rates of more than 1000 tonnes per hour, recent statistics show that most operations of Australian longwalls fall far below this figure. In response to this problem, the reseai'ch objective of this thesis was to identify as to why current longwall operations are not reaching the designed output capacities and recommend the means of increasing production and productivity to the optimum goal.

History

Year

1996

Thesis type

  • Masters thesis

Faculty/School

Department of Civil and Mining Engineering

Language

English

Disclaimer

Unless otherwise indicated, the views expressed in this thesis are those of the author and do not necessarily represent the views of the University of Wollongong.

Usage metrics

    Categories

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC