University of Wollongong
Browse

Class a prediction of a piled relieving slab using uncoupled models

Download (1.85 MB)
journal contribution
posted on 2024-11-14, 01:55 authored by David Oliveira, Dan Gorman, Frances Badelow
Construction of the new Windsor Road on/off ramps, part of the M2 Upgrade project, required limiting the loads and movements imposed on existing precast concrete walls so that no additional pressure was applied as a result of the new construction works. This was necessary due to possible structural deficiencies of some of the existing reinforced concrete elements. A piled relieving slab was adopted as the final solution to support the reinforced soil wall ramps and a comprehensive soil-structure interaction assessment was carried out in order to predict the pile head deflections and assess potential loading of the existing walls. A Class A prediction was carried out of the piled relieving slab performance using simplified uncoupled models which accounted for all likely loading mechanisms, including structural loads and induced soil movements. As the models were uncoupled, i.e. two distinct models, the interaction between them was assessed by plotting the load-displacement curves of both piles and the RSW/slab models, then identifying the equilibrium point. Instrumented piles confirmed the Class A prediction of very small pile head deflections indicating that the solution had successfully achieved the objective of limiting the applied loads onto the existing walls.

History

Citation

Oliveira, D., Gorman, D. & Badelow, F. (2012). Class a prediction of a piled relieving slab using uncoupled models. Australian Geomechanics Journal, 47 (3), 69-76.

Journal title

Australian Geomechanics Journal

Volume

47

Issue

3

Pagination

69-76

Language

English

RIS ID

72855

Usage metrics

    Categories

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC