University of Wollongong
Browse

Simulation-based evaluation of an integrated planning and scheduling algorithm for maintenance projects

Download (195.38 kB)
conference contribution
posted on 2024-11-13, 14:51 authored by Rohit Patil, Nagesh Shukla, Senevi KiridenaSenevi Kiridena
The field of maintenance project planning and scheduling is attracting increasing attention due to ever growing competition among manufacturing organisations. There is a lack of studies that has tackled all the aspects of maintenance project implementation such as costs, resources, down times, uncertainties, operational constraints, among others. Therefore, an approach which uses a unitary structuring method and discrete event simulation to integrate relevant data about the maintenance projects is proposed. The results of the evaluation, on a case from paper-pulp industry, have shown that the proposed approach is able to overcome most of the issues of maintenance planning and scheduling.

History

Citation

Patil, R., Shukla, N. & Kiridena, S. (2016). Simulation-based evaluation of an integrated planning and scheduling algorithm for maintenance projects. 23rd EurOMA Conference

Pagination

1-10

Language

English

RIS ID

108345

Usage metrics

    Categories

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC