posted on 2024-11-13, 07:48authored byVerne S Mutton, Michael Salu, Mark Johnston, Christian Mans
A systematic approach is required for the design of bulkheads including consideration of the longevity of building materials, quality control during construction and methods to monitor performance of the retention system. Bulkhead site preparation and construction method using wet mix concrete is described with particular reference to anchoring the bulkheads to the strata with keys and steel bolts and post-construction resin injection of the concrete/strata interface.
History
Citation
V. Mutton, M. Salu, M. Johnston and C. Mans, Design and construction of water holding bulkheads at Xstratacoal's Oaky No 1 Mine, 12th Coal Operators' Conference, University of Wollongong & the Australasian Institute of Mining and Metallurgy, 2012, 229-240.