Abstract

The three main Value at Risk (VaR) methodologies are historical, parametric and Monte Carlo Simulation. Cheung & Powell (2012), using a step-by-step teaching study, showed how a nonparametric historical VaR model could be constructed using Excel, thus benefitting teachers and researchers by providing them with a readily useable teaching study and an inexpensive and flexible VaR modelling option. This article extends that work by demonstrating how parametric and Monte Carlo Simulation VaR models can also be constructed in Excel, thus providing a total Excel modelling package encompassing all three VaR methods.

Share

COinS
 
 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.